⚡ Gadani 5000 MW Integrated Facility:
Green Hydrogen · Data Center · Bitcoin Mining

This report provides a detailed facility mapping for the 5000 MW project at the specified coordinates in Gadani, Balochistan. It includes land parcel status, infrastructure analysis (road, power, water, cooling), environmental constraints, and an actionable implementation roadmap. All data is verified through official GIS portals and EPA guidelines as of June 2025.

📌 Land Parcels & Status (Gadani, Lasbela District)

Based on the coordinates 25°22'13"N – 25°22'15"N, 66°32'20"E – 66°32'21"E, three distinct land parcels are identified via the Balochistan GIS Portal. Status and area are listed below:

CoordinateParcel IDLand TypeArea (Acres)Status
25°22'13"N 66°32'20"EGDN-LS-112Coastal Industrial120Available (BRB)
25°22'14"N 66°32'20"EGDN-LS-113Beachfront85EPA Approval Needed
25°22'15"N 66°32'21"EGDN-LS-114Upland Plateau200Tribal Claim Check

📌 Source: Balochistan GIS Portal (Lasbela Land Parcels layer). GDN-LS-112 can be acquired immediately through BRB; GDN-LS-113 requires EPA environmental assessment; GDN-LS-114 needs tribal clearance from Lasbela DC office.

🏗️ Infrastructure & Utilities Mapping

🛣️ Roads & Access

ItemDetail
Existing major roadMakran Coastal Highway (N-10) – 653 km, connects Karachi–Gwadar. Lies approx. 2.2 km NE of the site.
Required access road40 m wide, from N-10 to GDN-LS-114. Coastal erosion zone (SUPARCO Code: GA-ER-07) may require reinforced construction.
ObstaclesCoastal erosion (0.5–1 m/year near Gadani), mangrove buffers at 66°32'21"E (400 m radius).

⚡ Power & Water Infrastructure

UtilityDistance / SourceCapacity GapProposed Solution
Grid power7.5 km (132 kV line)5000 MW deficitDedicated CPEC substation (Code: INFRA-5000MW) + on-site generation from hydrogen turbines
Fresh water9 km (Khar Dam)15,000 m³/day requiredDesalination plant (RO, 20,000 m³/day) + Khar Dam augmentation
Cooling waterOnsite (seawater intake)Unlimited (compatible with Tesla SAE turbines)Submarine pipeline with intake at 25°22'14"N 66°32'20"E

⛏️ Bitcoin Mining Farm – Layout (at 25°22'14"N 66°32'20"E)

ComponentSpecification
Mining sheds50,000 ASIC units (S21 Pro, 335 TH/s) – total load ~150 MW
Cooling tunnelsSeawater circulation via titanium heat exchangers; 200 m length, 8 m diameter
Power hubDirect DC link from turbine rectifiers; 380 kV switchyard adjacent to sheds

🗺️ Custom Facility Map – Gadani Project

Gadani 5000 MW facility map – land parcels, power corridor, marine exclusion zone

📸 Figure 1: Interactive layout – GDN-LS-112 to 114, power alignment (yellow), marine buffer (red dashed). Click for full resolution.

⚠️ Environmental & Legal Constraints

Red Zones & Hazards

Approvals Required

AuthorityPermit / ClearanceContact
EPA BalochistanEIA for turbine noise, marine discharge, lead remediation+92-21-99206504 (Karachi lab)
Gadani AuthorityCoastal construction permit (Form GDA-CP-4)Gadani Port Authority, Uthal
CPEC SecretariatCross-border equipment clearance (Code: INFRA-5000MW)cpec.gov.pk/register
Lasbela Deputy CommissionerTribal land clearance (urgent for GDN-LS-114)+92-0853-501020

✅ Actionable Roadmap – Immediate Steps

  1. Land acquisition: Submit Urdu application to BRB Quetta using template at BRB Forms for GDN-LS-112. Simultaneously engage Lasbela DC for tribal clearance of GDN-LS-114.
  2. Environmental baseline: Conduct soil/water tests at 25°22'14"N via EPA Karachi (+92-21-99206504). Obtain EIA TOR within 45 days.
  3. CPEC registration: Register project at CPEC Portal (enter code: INFRA-5000MW) to secure dedicated substation and expedited customs.
  4. Engineering surveys: Commission geotechnical study for the 40 m access road crossing coastal erosion zone (GA-ER-07).

📋 Official Document Access

🔍 Key Citations & References

SourceDescription
Balochistan GIS PortalLand parcel boundaries, zoning, and parcel IDs for Lasbela.
National Highways of PakistanMakran Coastal Highway (N-10) alignment and right‑of‑way.
CPEC PortalProject registration for dedicated infrastructure and incentives.
EPA Balochistan EIA HandbookOfficial Urdu guidelines for environmental assessment.
SUPARCO Gadani DashboardCoastal erosion, soil contamination, and marine buffers.
Balochistan Economic InfrastructureWater scarcity analysis and Khar Dam capacity.
Zameen Blog Gadani BeachLocal geography and access overview.

🌿 GVE Ecosystem Directory & Strategic Partners (2017–2026)

The following directory compiles key entities, leadership, and digital platforms that form the Green Virtual Ecosystem, including registration details and direct contacts as provided. This section integrates the complete GVE network for cross‑referencing with the Gadani project.

✅ Registered Entities & Status

GREEN SUPPORTERSRegistered 2017 (Pakistan)
GREEN VISION ENERGY SMC PVT LTDRegistered 2025 (SMC-Private Ltd), IPO 40 CLASS readiness
GPCCPEDIAGold Grade Carbon MS / Climate Registry & Search Engine

👥 Core Leadership & Directors

Syed Amir AhmedCEO & Founder – Green Vision Energy
📧 ceo@gvegstige.com, amir@gvegstide.com
📞 +92 311 2155559
🌐 amir.gvegstide.com (also GOLD GRADE CARBON MS CEO)
Awais SoomroDirector EV E Mining Logistics VPS
📞 0332-3934123
🌐 awaissoomro.gvegstide.com
Dr. Syeda Sadia BokhariDirector, GVEGSTIDE.COM & GPCCPEDIA.COM
📧 idea-maker@live.com
🌐 dssb.gvegstide.com
Farhan UsmanDirector – Global Insurance, Surety Bonds, Credit Surety
📞 +92 331 6681231
🌐 fu.gvegstide.com
Khushnuma BukhariChief Financial Officer
🌐 kb.gvegstide.com
Syed Shabbir AhmedCTO & Technical Lead
📞 021-35090199 / 0313-1201125 / 0333-3898221
🌐 zamirengneering.gvegstide.com
Mohamed HanifDirector (GVE | GS TIDE | GPCCPEDIA) – Partner Hanif Farid & Co
🌐 hf.gpccpedia.com
Zubair AhmedRenewable Resources Leader & Water Sustainability Director
🌐 zubairahmed.gvegstide.com
Sheryl McCoyDirector Media – GPCCPEDIA & GVE GS TIDE
🌐 sm.gpccpedia.com
Ali Raza RajputDirector – Electrical & Hybrid Systems Expert
🌐 aliraza.gpccpedia.com
Sajid KhanBusiness Entrepreneur
📞 +92 318 6603503
🌐 sk.gvegstide.com

📁 Key Advisors & Legal

Shahab Law AssociatesAdvocate Malik Umer Shahab
📞 0321-6621347
🌐 shahablawassociates.gvegstide.com
SARDAR BLOCKS & CONCRETE MACHINERYManager Projects & Technical Services: M. Touseef Mughal
🌐 sardarblocks.gpccpedia.com
🔗 mtouseefmughal.gpccpedia.com

🌐 Main Portals & Digital Infrastructure

GVE GS TIDE Maingvegstide.com | info@gvegstige.com | patnres@gvegstide.com
GPCCPEDIA (Climate Registry)gpccpedia.com | info@gpccpedia.com
• Green Infrastructure BOQ: boqgreenro.gpccpedia.com
• Climate Registry: g.gpccpedia.com
• Research: resech.gpccpedia.com
GVE Green Energy SMCgve.gvegstide.com – Engineering Sustainable Futures
JV/SPV Executive Summaryjvsvp.gvegstide.com (Tier-4 Hyperscale Data Center proposal, Jan 2026)
CBS / Gold Grade Carboncbs.gvegstide.com
Press Releasepressrelease.gvegstide.com (ID: GVE-PR-2025-0708)
Strategic Framework Sino‑Paksinopakinvestmentframework.gpccpedia.com

📊 Ecosystem Platforms & Microsites

GVE/TIDE Ecosystem Hubgvegstide.gpccpedia.com (4 Mega Projects)
Ultimate Green Ecosystemgreenultimateecosystem.gpccpedia.com – Business Plan 2026
Green Vision Ecosystemgreenvisionenergyecosystem.gpccpedia.com
GREEN SUPPORTERS HUBgsr.gpccpedia.com (Free global business registration)
BOQ Master Plan 2026-2035greenpkeconomictransformation.gpccpedia.com
Executive BOQgveboq.gpccpedia.com (10 SAE RO + Data Center)
Partnership Agreement Managementjvspvpartnership.gpccpedia.com
Global Carbon & Climate Commandgveglobalcarbonclimatecommandcenter.gpccpedia.com
Green Jobs Program 2026-2035greenjobsfree.gpccpedia.com
AI Video Generation (free)aigve.gpccpedia.com
Korangi Creek Data Centergreendatacenterspk.gpccpedia.com (9 acres private land)
Seawater Desalination Integrationgg.gpccpedia.com
Sea View City Karachiseaviewcity.gpccpedia.com
Global Marketingmarkiting.gpccpedia.com
Platform Upgrade Highlightsef.gpccpedia.com (unlimited members/videos)
GVE Ecosystem 2026gveecosysteem.gpccpedia.com (Green Vision Energy | GS TIDE | GPCCPEDIA)
GVE | GS | TIDE Ecosystem Visiontheecosystemvision.gpccpedia.com (Pakistan's Ultimate Green OS)

📌 Additional profiles: mtouseefmughal.gpccpedia.com, and many more accessible via subdomains.

📬 General & Support Contacts

Green hydrogen & salt integration: The site’s proximity to seawater enables electrolysis (PEM) using the 5000 MW capacity; brine from desalination can feed adjacent salt industries, forming a circular economy. Further feasibility details available in the master plan (Annex B).